Industrial Electrical
Konya Sugar Factory Electrical Modernization
The entire electrical infrastructure of the sugar factory was renewed and a power compensation system was commissioned.
Konya
2500 kVA
Turk Seker A.S.
We carried out a comprehensive electrical modernization project at the Konya factory. A new 2,500 kVA transformer facility was built and a reactive power compensation system was commissioned.
Project Details
- project_category
- Industrial Electrical
- Project Location
- Konya
- project_power
- 2500 kVA
- project_client
- Turk Seker A.S.